Send the doors you want controlled and the date your New York space must be ready, and a ClearMax Labs technician replies with questions or a written scope. A rough list is fine. Most first messages are five lines and a few photos taken on a phone.
Last updated: November 2026
Start with the openings
Calls to this number may be recorded or answered by an automated assistant. Please do not share door codes, badge numbers or alarm codes by phone.
A useful first note covers seven things
- Building and floor. A prewar loft in Long Island City, a glass tower on Sixth Avenue and a two-story building in Staten Island each bring different cable routes and different people to ask before anything is drilled.
- The doors, one line each, with what they do: the tenant entry, a stair exit, the IT closet, a records or stock room, a freight or loading door, a gate.
- What is on each door today: a key cylinder, a keypad, the landlord's reader, an old card system, a buzzer, nothing.
- Two photos per door, one from each side, showing the frame and the hardware. Glass, aluminum storefront, hollow metal and wood doors each take different locks.
- How many people, and whether some work across floors or offices.
- Who speaks for the building, if you lease: the property manager or building engineer. Most New York owners review a hardware schedule and a certificate of insurance before work starts.
- The ready date, and whether the space is under construction, being fitted out or already occupied.
Mention any add-ons you are weighing, such as an entry intercom or cameras at the door, so they share one cable plan.
Photos that save a site visit
Phone photos answer most hardware questions before anyone travels. For each door, take one straight-on shot from the corridor side and one from the inside, then a close shot of the edge of the frame where the latch meets it, and one of the hinges. Add a photo of the network closet with the door open and a wide shot of the ceiling near the entry. That set usually tells a technician the door material, the frame type, whether there is room above the ceiling and where the controller can go.
Your doors, the building's doors
In a leased space some openings belong to you and some to the owner. Tenant entries, interior rooms and the closet are normally yours to control. Stair doors, corridor doors shared with neighbors and anything in the lobby usually are not, even when your staff use them every day. Mark each door on your list as yours, the building's or unsure, and the reply will sort out the unsure ones with the property manager before the scope is drawn.
Working in an occupied office
If your team is already in the space, say which hours are off limits for drilling and which doors must stay usable during the work. The plan then sequences one opening at a time, keeps every exit working while its hardware is changed, and saves the loud steps for the building's after-hours window.
Building rules set the calendar
In this city the slowest part of a door project is rarely the hardware. It is the building's window for noisy work, the freight elevator booking, the insurance paperwork and the engineer's sign-off on holes through fire-rated walls. Sending the ready date early lets the scope work backward from it and name the dates that depend on someone else.
Doors that need an extra question
Two kinds of request change the order of the work, so say so in the note if either applies. The first is a door that should hold people briefly after they push it. Delayed egress locks in New York need special review and approval by the Buildings commissioner. The scope treats that as a question for your architect or engineer, never as a standard option. The second is a lobby turnstile. Every automatic turnstile on an egress path has to be connected to the building's fire alarm system. Turnstiles are usually the building owner's project, so the reply asks who owns the lobby first.
Relocating, or adding a floor or second office
Give both addresses if you have them. The new doors are planned, cabled and tested while the current space keeps working, and the cutover is set for one evening or weekend. The scope says which parts move with you and which stay for the next tenant. For a second floor or office, give the head count at each, because one shared people list is planned differently from two separate systems.
Keep codes out of the message
Please do not send keypad codes, badge numbers, alarm codes or the login to a system already on site. The door list and photos are enough to plan. New credentials are issued in person at handover.
A door that fails right now
This form is read during business hours and is meant for planning. For a lock that will not release today, call whoever installed it or the building engineer. Clients on a ClearMax service plan use the contact in their handover binder.
What happens after you send it
A person reads it and replies with any open questions. Next comes a written scope listing each opening, its reader, its lock, how it opens from the inside and the work dates. If the site turns up a surprise, such as a frame packed with grout or a full riser, the scope is revised with you before work continues. It also lists what your side provides on work days: ceiling access, space in the network closet, building access for the crew and one person to call. At handover each door is tested with you, the administrator login goes to the person you name, and the door schedule and as-built records stay with you.
